Mechanical As-Built

005-Mekanik_Proje.png 014-Asbuilt_Proje.png
Mechanical As-Built

We update mechanical drawings according to actual manufacturing.

Who is it for?

Property Owners Contractors Investors Architects

Project Solutions

Mechanical As-Built

We mark the final state of the mechanical installation implemented on site on the project and prepare the final "As-built" mechanical projects. We document the actual locations and connections of pipe lines, valves, air handling units, and all other equipment in these projects. For investors and property owners, these documents showing the building's utility inventory are vital for maintenance, repair, and potential breakdowns. We provide contractors with the necessary document to complete the technical part of the handover. As-built mechanical projects are a technical guide that will be used throughout the entire life of the building.

Requirements

Construction site access, Measurement permit

Process

Measurement → Update → Inspection → Delivery

Estimated Duration

as early as 4 days, as late as 4 weeks